, it was decided that the septic system could be replaced, and it was cleared to begin. And it turned out that I was the best one, and ended up doing it.
We were unable to install a conventional system in the ground where we live, so we had to get what is called a ‘clear water’ system.
It is a big unit that sits outside the house, and the sewer goes into that treatment plant unit, and then the water is discharged onto the ground a short ways away.

We had to work fast, because it was getting cold and the ground was already beginning to freeze, and I had to do a little ground work before the system could go in. But I got it all in, and we are now using that system, which has been working great.
I had Rebecca running the Mini Excavator

As far as the loan/paperwork process, there is still no end in sight, so we continue to push ahead with that. One of my jobs this fall which was kind of fun was putting up a Quonset hut type shelter for a client.
I had good equipment to work with. Bobcat to prep the ground, a genie boom lift, and a scissor lift.
The photo shows the view down as I went way above the frame with the cover, and draped the cover over the frame from above.
Took 2-3 days to finish that project.